Post .schedule
POST /{namespace}/posts/{post}/schedule
Schedule puts a drafted Post on its Handle’s calendar for a set time.
- Noun
- Post
- Mode
do- Event
Post.scheduled
Inputs
| Input | Type | Required | Description |
|---|---|---|---|
post | Post | required | The drafted Post. |
at | datetime | required | When it goes out. |
Outputs
| Output | Type | Required | Description |
|---|---|---|---|
post | Post | required | The scheduled Post. |
Effects
- Emits
Post.scheduled. - Performed by the Content Lead.
- Two-way: it runs at once, in the
try,sendanddomodes.
Refuses when
| Check | Error | Fix | Then call |
|---|---|---|---|
| The key is valid, but its scopes do not allow this operation. | forbidden | Use a key whose scopes cover the operation, or ask an owner of the namespace to grant them. | Post.schedule |
When it waits
| Gate | Default |
|---|---|
| Decision class | Low: two-way, nothing at stake |
| Delay window | None: it runs once review passes. |
| Limit | The call Limit of the Permission it runs under. |
| Over the Limit | It waits pending for an Approval from the Founder. Approved, it runs; refused, it ends refused with limit-exceeded; unanswered by its deadline, it ends canceled. |